Ordre du jour :

Which of the following components is part of SAP EAM? Please choose the correct answer. Sales and Distribution. Plant Maintenance. Quality Management. Asset Accounting.

Which of the following is a key component of cost element accounting inSAP S/4HANA? Please choose the correct answer. Internal orders. Cost centers. Activity types. Profit centers.

In a project, what is the correct term for a sequence of activities and theirdependencies? Please choose the correct answer. Project definition. Work breakdown structure element. Milestones. Network.

Network. To record financial transactions. To define the components required for production. To track employee performance. To manage customer orders.

What are some of the functions of SAP Extended WarehouseManagement? There are 2 correct answers to this question. Storage-bin-level determination for incoming goods. Stock removal for outgoing goods. Inventory management at storage location level. Putaway with transfer orders.

What is a storage type in SAP Warehouse Management? Please choose the correct answer. A method for inventory valuation. A process for creating purchase orders. A classification of different types of storage sections in a warehouse. A code for identifying materials.

What types of procedures may be used to perform a cross-plant stocktransfer? Note: There are 3 correct Answers to this question. One-step procedure. Slotting and rearrangement. A. Two-step procedure. E. Stock transport order without delivery. D. Material requirements planning.

What information do you maintain for a general ledger account oncompany code level? There are 2 correct answers to this question. Account currency. Account type. Account control. Account group.

What is the function of the maintenance order in SAP EAM? Please choose the correct answer. To handle payroll processes. To manage sales orders. To record and track maintenance activities. To initiate procurement processes.

What object is always a true Controlling (CO) object? Please choose the correct answer. Project. Profit center. Cost center. Internal order.

What occurs after you change the status of a maintenance order totechnically completed? Note: There are 2 correct Answers to this question. The open purchase requisitions are deleted. C. The material list is updated in maintenance notification. A. The settlement rule is executed. B. The invoices can be processed.

Scenario: You are a production manager at a manufacturing plant usingSAP S/4HANA. The plant faces issues with tracking the exact status ofproduction orders and managing the components required for each order.You need to streamline the production process using SAP S/4HANA. Which steps would you take to address these issues? There are 3 correct answers to this question. Utilizing the SAP Fiori app for real-time monitoring of production orders. Integrating SAP Customer Relationship Management (CRM) to manage customerfeedback. Setting up routing to specify the sequence of operations for production. Implementing Bill of Materials (BOM) to define the required components foreach production order. Creating a custom financial report to track production costs.

What demand elements are evaluated during a successful MRP run?. D. Sales orders. B. Planned orders. C. Purchase requisitions. A. Scheduled lines.

In your warehouse, you want to ensure that material is putaway in the idealbin to improve effi ciency. What SAP Extended Warehouse Managementfeature do you implement? Please choose the correct answer. Yard management. Cross-docking. Slotting/rearrangement. Wave management.

What are some of the characteristics of the SAP Fiori UX design? Note:There are 2 correct Answers to this question. C. Function-based. D. Role-based. A. Data-based. B. Adaptive.

What are the main characteristics of SAP S/4HANA? There are 3 correct answers to this question. Can be run on any database. Minor changes are made to the data model. Reduced data footprint. Bring together OLAP and OLTP. Simplified applications.

What is the purpose of the SAP S/4HANA simplifi cation list? Please choose the correct answer. To provide custom code analysis that can be moved to S/4HANA. To provide a list of new SAP Fiori applications. To indicate functions of SAP S/4HANA that are not yet available. To perform real time data migration within SAP S/4HANA.

Which organizational units do you create for Financial Accounting (FI) inSAP S/4HANA Finance? Note: There are 2 correct Answers to thisquestion. B. Segment. A. Controlling area. Company code. C. Operating concern.

Which of the following activities can be performed using the SAP InventoryManagement module? There are 2 correct answers to this question. Creating purchase orders. Posting goods receipts. Posting goods issues. Managing financial transactions.

Which of the following areas are part of SAP SuccessFactors EmployeeCentral? There are 3 correct answers to this question. Time Management. Organization Management. Learning Management. Payroll. Success and Development.

What does a work center control? Note: There are 2 correct Answers to thisquestion. Scheduling of operations. Release of production orders. Calculation of costs of work performed. Valuation of bill of material components.

Which object is created to report on market characteristics, such ascustomer, product, and region?. C. Sales organization. B. Profitability segment. D. Profit center. A. Primary cost element.

A stock transfer that uses a stock transport order has certain advantages,select the advantages below 3 Correct answers. The receipt can be planned at the receiving plant. The delivery costs and a forwarder or carrier can be entered in the stock transportorder. The entire process (goods issue and goods receipt) can be monitored using thePO history. Stock is transferred between two plants belonging to the same company code.

Which key components are involved in the Lead to Cash process? There are 2 correct answers to this question. Supplier Management. Material Requirements Planning (MRP). Customer Relationship Management (CRM). Sales and Distribution (SD).

What does a work center control? There are TWO correct answers for this Question. Release of production orders. Calculation of costs of work performed. Valuation of bill of material components. Scheduling of operations.

In a project, what is linked via relationships? Please choose the correct answer. Networks. Work breakdown structure elements. Project definitions. Activities.

Scenario: As a fi nancial accountant, you are tasked with closing thefi nancial period for your company. Outline the key steps you would take inSAP S/4HANA to complete the period-end closing process. There are 3 correct answers to this question. Run depreciation. Post goods receipts. Perform balance carry forward. Create purchase orders. Perform foreign currency valuations.

Which of the following are business partner categories in SAP S/4HANA?Note: There are 3 correct Answers to this question. C. Department. A. Group. D. Company. Organization. B. Person.

You purchase raw materials with a purchase order against an internalorder. During which process step are journal entries posted? Please choose the correct answer. Save purchase requisition. Calculate the payment method. Release purchase order. Post valuated goods receipt.

Which of the following is a feature of Streamlined Procurement? Please choose the correct answer. Invoice processing. Source assignment. Supplier evaluation. Self-service requisitioning.

What is the purpose of using a Work Breakdown Structure (WBS)? Note:There are 3 correct Answers to this question. C. To manage equipment. D. To evaluate aggregated data. E. To define responsibilities. B. To schedule warehouse tasks. A. To allocate budgets.

What is required to report on a combination of characteristics, such ascustomer, product, and region? Please choose the correct answer. Profit centers. Profitability segments. Primary cost elements. G/L accounts.

Which of the following are Management Accounting (CO) organizationallevels in SAP S/4HANA Finance? There are 2 correct answers to this question. Company code. Controlling area. Segment. Operating concern.

What tasks are performed for external reporting purposes? There are 2 correct answers to this question. Track cost center spending. Create a profit and loss statement. Perform inventory valuation. Calculate production variances.

What is included in the structure of a maintenance order? Please choosethe correct answer. Construction type. Plan costs. Activity. Bill of Material.

What master data records are used in advanced planning? Note: There are3 correct Answers to this question. Bill of material. D. Location. B. Production version. Resource. Product.

What can be assigned to a profi t center? There are 2 correct answers to this question. Asset. Operating concern. Organizational unit. Material. Company code.

What is the primary database technology used by SAP S/4HANA? Please choose the correct answer. SAP HANA. IBM DB2. Oracle Database. Microsoft SQL Server.

Which step updates cost-based profi tability analysis?. B. Create the outbound delivery. D. Save the billing document. A. Post goods issue. C. Post the customer's payment.

What is the main purpose of the SAP Fiori user experience (UX) in SAPS/4HANA? Please choose the correct answer. To simplify the user interface and improve user productivity. To provide a complex and detailed user interface. To restrict access to business data. To enhance data security.

Which SAP line-of-business solution can be used to enhance the scope ofSAP S/4HANA Sourcing and Procurement?. B. SAP SuccessFactors. D. SAP Cloud for Travel and Expense. A. SAP Customer Experience. C. SAP Ariba.

Which enterprise structure elements are in a sales area? There are 2 correct answers for this question. Division. Plant. Distribution channel. Company code.

What are some of the functions of SAP Extended WarehouseManagement? Note: There are 2 correct Answers to this question. B. Inventory management at storage location level. C. Put away with transfer orders. D. Storage-bin-level determination for incoming goods. A. Mobile device integration.

Which of the following are benefi ts of implementing SAP EAM? There are 2 correct answers to this question. Improved asset reliability. Increased customer satisfaction. Enhanced sales management. Optimized maintenance processes.

What are the key technologies that enabled the development of SAPS/4HANA? There are 2 correct answers to this question. Large memory capacities. Mobile devices. Multicore central processing units. Fast wireless networking.

When creating condition master records, what data properties does thecondition type control? Note: There are 2 correct Answers to this question. A. Sales organization. C. Currency. D. Scales. B. Validity period.

What technology elements supercharge the human experience whenworking with X and O data? Note: There are 2 correct Answers to thisquestion. D. Design thinking. A. Blockchain. B. Machine learning predictions. C. Conversational AI.

Which documents are created when you post a valuated goods receipt for consumable materials? There are 2 correct answers for this Question. Vendor invoice document. Accounting document. Controlling document. Sales order document.

You want the SAP S/4HANA system to perform product cost planning.What master data is used to calculate the quantity structure? Note: Thereare 2 correct Answers to this question. A. Routing. B. Bill of material. D. Work center. C. Cost center.

What is created when you post a valuated goods receipt for consumablematerials?. D. Vendor payment. B. Delivery note. C. Vendor invoice document. A. Controlling document.

What does the material ledger in SAP S/4HANA enable? There are TWO correct answers for this Question. Reporting of all materials required during maintenance processing. Reporting for parallel accounting. Material valuation in multiple currencies. Recording of all business transactions.

Which of the following apply to Sales and Distribution enterprisestructures? Note: There are 3 correct Answers to this question. B. A division can be assigned to more than one sales organization. D. A distribution channel can be assigned to many sales organizations. E. A division can only be assigned to one sales organization. A. A sales organization can be assigned to more than one company code. C. A sales organization can only be assigned to one company code.

Which business processes post to the general ledger? There are 3 correct answers to this question. Posting an activity price. Posting an activity allocation. Goods issue from stock. Purchase order creation. Depreciation posting.

How can you post internal labor costs to a network activity? Two correctanswers. B. By service entry sheet. D. By activity allocation. C. By confirmation. A. By distribution.

Which objects can be assigned to a purchasing organization? Note: Thereare 2 correct Answers to this question. C. Company code. B. Material master. A. Vendor. D. Cost center. E. Plant.

Which of the following is a key feature of the SAP S/4HANA ManufacturingExecution System (MES)? Please choose the correct answer. Production order execution and monitoring. Human resources management. Customer relationship management. Financial accounting and reporting.

What document, when saved, creates a commitment for an internal order?. A. Purchase order. B. Maintenance order. D. Sales order. C. Production order.

What happens when you post a goods issue in a delivery document for asales order? Note: There are 3 correct Answers to this question. The billing due list is updated. An invoice is created. Inventory quantities are updated. A warehouse transfer order is created. An accounting journal entry is created.

Scenario: As a procurement manager, you are tasked with sourcing rawmaterials from suppliers. Outline the key steps you would take in SAPS/4HANA from sourcing the materials to completing the payment to thesupplier. Please select all the correct answers that apply. Create a purchase order based on the requisition. Issue a goods receipt upon receiving the materials. Create a purchase requisition for the raw materials. Generate a sales order for the materials. Record the supplier invoice and process the payment.

What is the primary purpose of the Warehouse Management module inSAP S/4HANA? Please choose the correct answer. To manage customer orders. To handle financial transactions. To optimize storage space and track inventory movements. To manage supplier relationships.

What is required for picking in SAP Extended Warehouse Management? Please choose the correct answer. Outbound delivery order. Sales order. Stock transport order. Warehouse material document.

What can you record during overall completion confi rmation of amaintenance order?. D. Counter readings. B. Planned capacity. A. Serial numbers. C. Planned time.

In a make-to-order process, a raw material needs to be issued from thewarehouse to the manufacturing line. To which order will you post thegoods issue?. A. Stock transfer order. C. Planned order. D. Production order. B. Sales order.

Which business process activities create a Financial Accounting (FI)document? Note: There are 3 correct Answers to this question. C. Transfer stock to another company code. E. Execute a depreciation run. A. Transfer stock from storage location to storage location. B. Post goods issue to a production order. D. Create a sales order.

What does Management Accounting provide? There are 2 correct answers to this question. Account balances for customers and vendors. Reports that meet accounting standards and principles. Information used for internal areas of responsibility. Profitability analysis of market segments.

What does a work center control? Note: There are 2 correct Answers to thisquestion. A. Calculation of costs of work performed. C. Release of production orders. B. Valuation of bill of material components. D. Availability of capacity.

In what step of the purchase-to-pay process is a purchase requisitiongenerated? Please choose the correct answer. Invoice verification. Determination of requirements. Source of supply determination. Vendor selection.

Which of the following ways to create an employee master record uses asequence of infotypes to defi ne one employee?. D. Single screen maintenance. A. Personnel actions. C. Fast entry. B. Multi-screen maintenance.

What is document splitting used for?. C. To achieve balance sheet reports by segments. A. To summarize controlling line items to produce fewer line items. B. To update multiple ledgers for parallel accounting. D. To summarize general ledger (G/L) postings in multiple currencies.

You are creating a new company code that you want to assign to the groupcontrolling area. Which characteristics must the new company code sharewith the other company codes already assigned to the controlling area?Note: There are 2 correct Answers to this question. D. Fiscal year variant. C. Operating chart of accounts. Currency. B. Posting period variant.

Which intelligent technologies have been enabled by the new codeline ofSAP S/4HANA? Note: There are 3 correct Answers to this question. C. Virtual reality (VR). D. Machine learning (ML). A. Internet of Things (IoT). B. Artificial intelligence (AI). E. Machine translation (MT).

What tasks are performed for legal reporting? There are 2 correct answers to this question. Create a balance sheet. Track company car costs. Perform inventory valuation. Calculate production variances.

In SAP S/4HANA, which module primarily handles the recruit to retireprocess? Please choose the correct answer. SAP MM (Material Management). SAP HCM (Human Capital Management). SAP PP (Production Planning). SAP SD (Sales and Distribution).

What is the primary purpose of SAP Enterprise Asset Management (EAM)? Please choose the correct answer. To maintain and manage physical assets. To manage human resources. To control financial accounting. To handle customer relationships.

What does a posting key control? Note: There are 3 correct Answers to thisquestion. B. Debit/credit posting. D. Field status for all line items. A. Account type. C. Document currency.

Which of the following activities are part of the Lead to Cash process inSAP S/4HANA? There are 2 correct answers to this question. Inventory Management. Delivery Processing. Accounts Payable. Sales Order Processing.

Which features of SAP S/4HANA contribute to its real-time processingcapability? There are 2 correct answers to this question. Traditional batch processing. Columnar data storage. In-memory computing. High data redundancy.

What are some key characteristics of the SAP HANA database used in SAPS/4HANA? There are 2 correct answers to this question. High data redundancy. Disk-based data processing. Columnar data storage. In-memory computing.

What is the primary purpose of the General Ledger (GL) in SAP S/4HANAFinancial Accounting? Please choose the correct answer. To manage supplier relationships. To track inventory movements. To record all business transactions in a balanced accounting system. To manage customer orders.

What activities can an employee complete using employee self-service?Note: There are 3 correct Answers to this question. D. Book a training course. B. Plan costs. A. Enroll in benefits. C. Plan budget. E. Enter time sheet.

What type of document is generated for an external network activity?. D. Reservation. C. Production order. A. Sales order. B. Purchase requisition.

What is the result of converting a planned order? Note: There are 2 correctAnswers to this question. A. A purchase requisition. C. A production order. B. A planned independent requirement. D. A purchase order.

Which of the following represents the highest-level unit of allorganizational elements in SAP S/4HANA?. C. Controlling area. D. Company code. A. Operating concern. B. Client.

You have created an asset master record. Which other master data recordis created automatically?. A. Work center. C. Functional location. B. Maintenance bill of material. D. Equipment.

What is required for putaway in SAP Extended Warehouse Management? Please choose the correct answer. Inbound delivery order. Stock transport order. Sales order. Warehouse transfer order.

What action assigns actual costs to a project?. A. Material withdrawal from stock. C. Releasing a project budget. D. Saving a purchase order. B. Processing a cost forecast.

What data must be linked to a cost center to derive segment accounting?. C. Cost center category. B. Controlling area. A. Profit center. D. General ledger account.

What function commits funds to the budget of a WBS element?. A. Profitability analysis. C. Availability control. B. Cost center accounting. D. Settlement processing.

Scenario: As a sales manager at a manufacturing company, you areresponsible for ensuring a smooth Lead to Cash process. You receive alead from a potential customer who is interested in purchasing a largequantity of your products. Describe the steps you would take in SAPS/4HANA to convert this lead into cash. Please select all the correct answers that apply. Generate an invoice for the delivered products. Manage supplier payments. Process the delivery and create the shipment. Record the receipt of payment from the customer. Create a sales order from the lead.

What are the benefi ts of using a business partner in SAP S/4HANA? Note:There are 2 correct Answers to this question. Vendors are managed separately from customers. It provides a harmonized architecture. You can maintain multiple addresses for an entity. General data is unique to each role.

What are the benefi ts of using a business partner in SAP S/4HANA? Note:There are 2 correct Answers to this question. A. Vendors are managed separately from customers. B. It reduces the amount of redundant data. D. It provides a harmonized architecture. C. General data is unique to each role.

What is an element that you can assign to the SAP Human Managementorganizational structure? Please choose the correct answer. Operating concern. Cost center. Profitability segment. Cost element.

What can you record during overall completion confi rmation of amaintenance order? Please choose the correct answer. Notification completion. Measurements. Planned time. Serial numbers.

What is the correct sequence of steps in the order-to-cash businessprocess? Please choose the correct answer. Check availability, Create sales order, Post goods issue, Billing. Check availability, Create sales order, Billing, Post goods issue. Create sales order, Check availability, Process a delivery document, Post goodsissue. Create sales order, Check availability, Plan transportation, Post goods issue.

In SAP Project Systems, what is the primary purpose of a Work BreakdownStructure (WBS)? Please choose the correct answer. To establish the project's financial budget. To allocate resources to project tasks. To define project milestones. To organize and define the total scope of the project.

Which main components feature the intelligent enterprise? There are 3 correct answers to this question. SAP cloud applications. Intelligent technologie. Digital platform. Intelligent suite. Intelligent analytics.

Which objects can be assigned to a profi t center? Note: There are 2 correctAnswers to this question. B. Purchase order item. D. Sales order item. C. Sales organization. A. Material.

Which of the following is a permitted hierarchical structure forManagement Accounting in the SAPS/4HANA enterprise structure?. B. An operating concern is assigned to a controlling area. C. An operating concern is assigned to a company code. A. A controlling area is assigned to a plant. D. A controlling area is assigned to an operating concern.

When is backorder processing considered?. D. When advanced available-to-promise is unavailable. A. When order quantity is not fully confirmed. B.When saving a sales order. C. When delivery dates can be met.

Which processes can be automatically performed when you post an orderconfi rmation for a production order? Note: There are 3 correct Answers tothis question. D. Post actual costs. B. Order settlement. C. Goods issue. E. Variance calculation. A. Goods receipt.

Which of the following functions can result in a creation of reservations fora production order? There are 2 correct answers to this question. Convert planned order to production order. Record manufacturing activities. Calculate production cost. Release production order.

Which maintenance order element includes the fi eld values for work center,control key, and activity type?. A. Material list. B. Settlement rule. C. Object list. D. Operation.

Which SAP line-of-business solution can be used to enhance the SAPS/4HANA sourcing and procurement scope? Please choose the correct answer. SAP SuccessFactors. SAP C/4HANA. SAP Ariba. SAP Leonardo.

Which SAP solution is used to perform marketing operations within theSAP S/4HANA suite? Please choose the correct answer. SAP Fieldglass. SAP SuccessFactors. SAP Hybris. SAP Ariba.

What are the integration points between a fi xed asset and a cost center? There are TWO correct answers for this Question. Asset creation. Asset book value. Asset acquisition. Depreciation run.

Which of the following sequences of the source-to-pay process steps iscorrect?. B. Determination of requirements. Vendor selection. Purchase order handling,Goods receipt, Invoice verification. C. Source of supply determination, Vendor selection, Determination ofrequirements, Purchase order handling, Goods receipt. A. Determination of requirements, Purchase order handling, Handling of payments,Goods receipt. Invoice verification. D. Vendor selection, Source of supply determination, Purchase order monitoring,Goods receipt, Handling of payments.

What is the integration point between an internal order and a fi xed asset? Please choose the correct answer. Depreciation area. Asset class. Settlement rule. Order type.

What can you record during overall completion confi rmation of amaintenance order?. Measurements. Serial numbers. Notification completion. Planned time.

What can a successful MRP run create? Please choose the correct answer. Reservations. Dependent requirements. Planned independent requirements. Purchase orders.

How are costs and revenues managed in SAP Project Systems? Please choose the correct answer. Through cost centers and internal orders. Through asset management. Using WBS elements and networks. By using G/L accounts directly.

Which of the following activities are part of the period-end closing processin SAP S/4HANA Financial Accounting? There are 2 correct answers to this question. Running depreciation. Performing foreign currency valuations. Creating sales orders. Posting goods issues.

What is the correct sequence of steps in the sales and distributionprocess?. D. Check availability Create sales order Post goods issue Billing. A. Check availability Create sales order Billing Post goods issue. C. Create sales order Check availability Process delivery document Post goodsissue. B. Create sales order Check availability Plan transportation Post goods issue.

A goods issue is posted against a production order. What are the results?Note: There are 3 correct Answers to this question. The material reservation is reduced. A warehouse task is created. A controlling document is created. Actual costs are updated in the production order. Internal labor costs are posted.

Which of the following are benefi ts of using SAP S/4HANA for production planning and execution? There are 2 correct answers to this question. Improved production efficiency. Real-time inventory management. Simplified customer billing. Enhanced employee benefits.

Which master records are directly assigned to a company code? Note:There are 2 correct Answers to this question. B. Activity type. C. Fixed asset. D. Material. A. Cost center.

What are functions of SAP Extended Warehouse Management? There are 2 correct answers to this question. Putaway with transfer orders. Inventory management at storage bin level. Expected goods receipt. Inventory management at storage location level.

What is a typical sequence of process steps in corrective maintenance?. A. Create notification Create order Release order Execute order Complete order. B. Create task list Create notification Schedule notification Complete order Billing. C. Create notification Release order Execute order Complete order Billing. D. Create task list Create notification Schedule notification Release order Completeorder.

What is the purpose of using a statistical key fi gure? Please choose the correct answer. To use as a tracing factor in a cost distribution. To calculate activity prices. To estimate the standard cost estimate for a material. To collect actual expenses for an area of responsibility.

Which controlling objects is a statistical object? Note: There are 2 correctAnswers to this question. D. Profit center. A. Profitability segment. B. Cost center. C. Internal order.

Scenario: A manufacturing company is transitioning to SAP S/4HANA toimprove its operational effi ciency and data management. The company aims to leverage SAP S/4HANA'scapabilities to achieve real-time insights into its production processes.What steps should the company take to maximize the benefi ts of SAPS/4HANA? There are 3 correct answers to this question. Utilize the SAP Fiori user experience for simplified access to data. Take advantage of in-memory computing for real-time data analysis. Deploy SAP S/4HANA on-premise to maintain complete control over the system. Avoid using SAP HANA's columnar data storage to minimize complexity. Implement SAP S/4HANA on a traditional disk-based database.

What are the key benefi ts of implementing the SAP SuccessFactors suite inthe recruit to retire process? There are 2 correct answers to this question. Streamlined HR processes. Improved employee engagement. Enhanced production planning. Better vendor management.

What print technologies does SAP S/4HANA output management support? There are 2 correct answers to this question. Adobe forms using fragments. Smart Forms. Microsoft Excel. Adobe LiveCycle Designer.

When creating a warehouse number in the SAP enterprise structure, whatorganizational elements must be assigned? Note: There are 2 correctAnswers to this question. C. Company code. A. Plant. D. Shipping point. B. Storage location.

Which of the following is the hierarchical model of a project? Pleasechoose the correct answer. Network. Task list. Activity. Work breakdown structure.

Which processes can be automatically performed when you post an order confi rmation for a production order? There are 3 correct answers to this question. Order settlement. Post actual costs. Goods issue. Goods receipt. Variance calculation.

In SAP S/4HANA Financial Accounting, what is the signifi cance of a FiscalYear Variant? Please choose the correct answer. It manages the chart of accounts. It sets up currency exchange rates. It handles tax calculations. It defines the posting periods and fiscal year structure.

In the Lead to Cash process, which document is typically generated afterthe delivery is created? Please choose the correct answer. Sales Quotation. Sales Order. Purchase Order. Invoice.

What is the primary purpose of the Controlling (CO) module in SAPS/4HANA? Please choose the correct answer. To manage production planning. To provide financial and operational information. To handle sales and distribution. To manage human resources.

In a project, what is the correct term for a group of dependencies,activities, and relationships sequenced in chronological order?. C. Network. B. Project definition. D. Milestones. A. Work breakdown structure element.

What is the outcome of an automatic payment run? There are 3 correct answers to this question. Cleared item in vendor’s account. Financial accounting document. Data prepared for printing. Open item in vendor’s account. Approval process initiated.

To what object can you settle an internal order?. Material. A. Statistical key figure. D. Profit center. C. Fixed asset.

Which of the following can be maintained in a maintenance notifi cation?Note: There are 3 correct Answers to this question. A. Capacity requirements. B. Materials planning. C. Equipment. Tasks. E. Cause of damage.

You purchase raw materials with a purchase order against a cost center.During which process step are fi nancial accounting documents posted?. C. Approve purchase order. B. Calculate the payment method. A. Post valuated goods receipt. D. Save purchase order.

You post an invoice to purchase a company car. What accounts are postedin the journal entry? Note: There are 3 correct Answers to this question. E. Expense account. A. Asset account. B. Supplier account. C. Material account. D. Tax account.

Which of the following goods movement creates an accounting documentin the general ledger? Please choose the correct answer. A stock transfer between company codes. A transfer posting between quality inspection stock and unrestricted stock. A stock transfer between storage locations. A transfer posting from unrestricted stock to block stock.

What is the purpose of milestone billing in SAP Project Systems? Please choose the correct answer. To allocate resources to project tasks. To monitor project progress. To trigger billing at predefined stages of the project. To create cost plans for the project.

Which of the following activities are part of the Source to Pay process inSAP S/4HANA? There are 2 correct answers to this question. Creating Sales Orders. Creating Purchase Requisitions. Creating Purchase Orders. Managing Customer Invoices.

For which object do you plan activity prices?. B. Cost center. A. Internal order. D. Profit center. C. WBS element.

In a warehouse, what represents the physical location where the goods arestored?. B. Storage type. A. Storage location. D. Plant. C. Storage bin.

Which of the following can be maintained in a maintenance notifi cation?Note: There are 3 correct Answers to this question. Cause of damage. Operations. Location data. Materials list. Tasks.

In the Source to Pay process, what is the signifi cance of the Goods Receipt(GR) step? Please choose the correct answer. It confirms the order with the supplier. It records the receipt of goods from the supplier into inventory. It initiates the payment process to the supplier. It generates the purchase requisition.

Which of the following elements can be included in a network in SAPProject Systems? Please choose the correct answer. Project tasks. G/L accounts. Cost centers. Activities.

Why might you create an equipment master record? There are 2 correct answers to this question. To report and track preventive maintenance tasks for an object. To report the effects of usage on the likelihood of damage to the installedequipment. To functionality represent the technical system structures in your company. To report the usage time of an object at a functional location.

What is the result of posting a vendor's invoice?. B. Vendor payment is posted. D. The purchase order history is updated. A. The vendor's account is cleared of open items. C. The material ledger document is generated.

Which of the following can be included in a customer pricing conditionrecord? There are 2 correct answers to this question. Invoice amounts. Discounts. Surcharges. Order values.

What business partner role connects the supplier with your companycode's balance sheet?. A. Business Partner General. Supplier. C. FI Customer. D. FI Vendor.

What is document splitting used for? Please choose the correct answer. To fill the segment characteristic in all line items. To summarize G/L postings at the controlling area level. To update multiple ledgers for parallel accounting. To summarize CO line items to produce fewer line items.

Which SAP Fiori application types use SAP HANA capabilities directly?Note: There are 2 correct Answers to this question. C. Transactional. A. Web Dynpro. D. Fact sheet. B. Analytical.

When you post an accounting document, for which line item must youenter a transaction type?. C. Supplier account. D. Asset account. B. Material account. Customer account.

Which of the following are benefi ts of using networks in SAP ProjectSystems? There are 2 correct answers to this question. Enhanced payroll processing. Real-time progress tracking. Simplified material procurement. Improved resource allocation.

To which application areas can Cross-Application Time Sheet (CATS) databe transferred directly? Note: There are 3 correct Answers to this question. C. Materials Management (MM). A. Human Capital Management (HCM). D. Customer Service (CS). B. Sales and Distribution (SD). E. Production Planning (PP).

What activities can an employee complete using employee self-service?Note: There are 3 correct Answers to this question. Submit travel expenses. Enter work times. Enroll in benefits. Control costs. Perform compensation planning.

Which backorder processing (BOP) strategy has fi rst processing priorityand is used to release confi rmed stock to prioritize other orders to planfuture stock needs?. C. Redistribute. A. Gain. B. Fill. D. Lose.

Scenario: You are responsible for managing the warehouse operations foryour company. You need to optimize the storage space and ensureaccurate tracking of inventory movements. Outline the key steps you wouldtake in SAP S/4HANA to achieve this. There are 3 correct answers to this question. Create financial reports. Set up storage bins. Create purchase orders. Define storage types. Perform goods receipt postings.

When creating a business partner, what is required to set up businesspartner usage in different levels of the organization?. A. Account group. B. Business partner role. C. Business partner function. D. Business partner type.

Which step in the order to cash business process integrates withprofi tability analysis? Please choose the correct answer. Generating a invoice. Creating an outbound delivery. Generating a sales order. Saving a transfer order.

What general ledger account information is defi ned at the chart ofaccounts level? Please choose the correct answer. Account number. Account management. Account balance. Account group.

Which end-to-end business processes are covered by SAP S/4HANA in thecontext of the Intelligent Enterprise? Note: There are 3 correct Answers tothis question. E. Supply to sell. A. Request to service. C. Buy to maintain. D. Record to report. B. Source to contract.

Which of the following processes is NOT part of the recruit to retirelifecycle? Please choose the correct answer. Performance Management. Recruitment. Vendor Management. Payroll Processing.

What happens when you post a goods issue in a delivery document for asales order? Note: There are 3 correct Answers to this question. D. Inventory quantities are updated. B. An invoice is created. C. An EWM outbound delivery order is created. A. A material ledger document is created. E. The billing due list is updated.

How do you use the results of a released standard cost estimate? There are 2 correct answers to this question. To determine a material sales price in Sales and Distribution. To valuate the material stock quantity. To calculate production overhead. To calculate the price of an activity type.

What does a depreciation area control? There are TWO correct answers for this Question. Estimated useful life. Depreciation start date. Depreciation accounts. Asset class.

A goods issue is posted against a production order. What are the results?Note: There are 3 correct Answers to this question. E. Actual costs are updated in the production order. D. The material reservation is reduced. A. Internal labor costs are posted. C. A warehouse task is created. B. A material ledger document is created.

In the enterprise structure, what Human Resources organizational elementis assigned directly to a company code?. B. Position. D. Personnel area. C. Organizational unit. A. Employee grouping.

Which activities are typically included in the "Recruit" phase of the recruit toretire process? There are 2 correct answers to this question. Employee Exit Management. Job Posting. Candidate Screening.

At which steps in the order-to-cash process are postings made to thegeneral ledger (G/L)? Note: There are 2 correct Answers to this question. C. Saving an invoice. D. Creating a sales order. B. Posting a goods issue. A. Creating an outbound delivery.

Which document post directly to the universal journal? There are THREE correct answers for this Question. Sales document. Material document. Material Ledger document. Asset Accounting document. Profitability Analysis document.

For what network activity can you plan capacities?. External activity. B. Internal activity. A. Service activity. C. Cost activity.

Which objects can you settle There are 2 correct answers to this question. Overhead order. Profitability segment. Activity type. WBS element.

Which of the following are selection modes for running MRP? Note: Thereare 3 correct Answers to this question. E. MRP Live. A. Backorder Processing. C. Regenerative MRP. B. Classical MRP. D. Predictive MRP.

What MRP control parameter defi nes the scope of a planning run when thesystem only takes into account changes that are within the planninghorizon, and only plans materials to which MRP-relevant changes havebeen made?. D. Planning mode. C. Procurement type. B. Processing key - NETCH. A. Processing key - NEUPL.

Which of the following is a key benefi t of SAP S/4HANA? Please choose the correct answer. Limited integration capabilities. Real-time data processing. Increased manual data entry. Enhanced data redundancy.

In SAP S/4HANA, which type of cost is directly traceable to a cost object? Please choose the correct answer. Direct cost. Variable cost. Fixed cost. Indirect cost.

Which documents are typically involved in the SAP S/4HANA FinancialAccounting process? There are 2 correct answers to this question. Vendor Invoice. Goods Issue. Purchase Requisition. General Ledger Posting.

In the SAP S/4HANA Design to Operate process, which module is primarily responsible for production planning and execution? Please choose the correct answer. SAP Project Systems (PS). SAP Production Planning (PP). SAP Financial Accounting (FI). SAP Enterprise Asset Management (EAM).

What must you do in a purchase order to purchase a material for a costcenter?. C. Enter an account assignment category. D. Enter an activity type for the cost center in the purchasing document. B. Enter a purchase order item category. A. Change the material type accordingly.

What elements in the Human Capital Management organizational structurecan receive cost center assignment? There are 2 correct answers to this question. Job. Organizational unit. Position. Person.

In which component do you maintain primary and secondary cost elementmaster records? Please choose the correct answer. Cost accounting. Profitability analysis. Internal order accounting. General ledger accounting.

What master data in the activity type is used to post an activity allocation?. D. Statistical key figure. B. Internal order. C. Controlling area. A. Secondary cost element.

Which of the following displays a collection of all records created for apersonnel number? Please choose the correct answer. Organizational assignment. Personnel action. Personnel file. Employee subgrouping.

What planning tool prioritizes sales order forecasting and strategicallyplans inventory buffers?. C. MRP simulation and resolution. B. Backorder processing (BOP). A. Constraint-based planning (PP/DS). D. Demand-driven MRP (DDMRP).

What is the name of the role-based, personalized UI client that enablesusers to access SAP Fiori applications side by side with established UIs?. B. SAP GUI. A. SAP Fiori Launchpad. C. SAP Design Studio. D. SAP Business Client.

You need stock materials to complete your maintenance process. At whatsteps can a material reservation be created? Please choose the correct answer. Purchase requisition creation. Technically complete an order. Save and release order. Availability check.

What is one advantage of using stock transport orders instead of stocktransfers?. D. The ownership transfer and carrier delivery costs are delayed until goods receipt. C. The quality inspection is performed by the sending plant. B. Goods movements occur in one step, only at goods issue. A. The process of goods issue and goods receipt is monitored using thepurchase order (PO) history.

What is the primary purpose of the Source to Pay process in SAPS/4HANA? Please choose the correct answer. Managing customer orders. Managing financial transactions. Managing warehouse operations. Managing supplier relationships and procurement activities.

What fi elds are required when you create a cost center? There are TWO correct answers for this Question. Department. Hierarchy area. Person responsible. Address.

What are the key components of a warehouse number in SAP WarehouseManagement? There are 2 correct answers to this question. Purchase requisitions. Vendor invoices. Storage bins. Storage types.

Which controlling objects can be settled by a settlement rule in SAP S/4HANA? Note: There are 3 correct Answers to this question. A. Profit center. B. Sales order. E. Maintenance order. D. Production order. C. WBS element.